top of page

Heat Treatment Furnace Energy Saving: 10 Checks from BEE's Study

Advance Heating Systems
1 day ago
5 min read

In a forging or heat-treatment shop, the furnace is where most of the energy bill goes. The Bureau of Energy Efficiency (BEE) found that metal heating takes 47–64% of a forging unit's energy, and forging plus heat treatment another 27–30%.

The good news is that much of the waste can be found with simple checks. BEE estimates that furnaces and their auxiliaries can save about 10–35% overall. This guide turns BEE's findings into ten checks you can carry out with a flue gas analyser, an infrared thermometer and your fuel records.

Key takeaways

  • Run burners at the right air-fuel ratio: BEE recommends 1.12–1.15 for gas and 1.15–1.20 for liquid fuel.

  • Aim for a flue exit temperature of 250–300°C. Hotter flue gas means heat thrown away.

  • For heat-treatment furnaces, BEE suggests keeping the ceiling at 110–120°C and side walls at 85–100°C on the outside.

  • Oil and gas furnaces often overheat metal by 10–30°C. Better control fixes this.

  • Ceramic-fibre insulation and relining cut wall losses and heat-up time.

  • Switching oil to gas saves about 5–10% on its own.

  • Track energy per tonne, not just the monthly bill.

Where the numbers come from

Most figures in this post come from BEE's Forging Sector Energy Mapping Report. That study surveyed forging clusters across India. It found the fuel mix was about 35% electricity, 38% oil and 21% gas. Reheating used induction billet heaters, oil-fired (FO/LSHS) furnaces and gas-fired (PNG/LPG) furnaces.

We also refer to a BIS draft guideline for fuel-fired reheating furnaces (the first revision of IS 17082), which sets out design targets for insulation and heat recovery.

The 10 checks

1. Measure energy per tonne

Before changing anything, work out how much fuel or electricity you use per tonne of good output. Use at least a month of data. Without this baseline you cannot tell whether a change worked.

For comparison, BEE gives a benchmark of 330 kWh per tonne for induction billet heaters.

2. Check the air-fuel ratio

Too much excess air carries heat out of the flue. Too little causes incomplete combustion and soot.

Fuel

BEE recommended air-fuel ratio

Gas (PNG / LPG)

1.12–1.15

Liquid fuel (oil)

1.15–1.20

Use a flue gas analyser to check oxygen or CO₂ at the flue and adjust the burner. The BIS draft for reheating furnaces suggests a maximum of 10% excess air.

3. Measure flue exit temperature

BEE suggests a flue exit temperature of 250–300°C. If your flue gas is much hotter, you are wasting heat. Options:

  • a recuperator to preheat combustion air;

  • using flue gas to preheat the charge or a pre-heat zone;

  • better burner tuning.

The BIS draft describes recuperators that preheat combustion air up to 650°C and are intended to recover 75–80% of flue heat in continuous reheating furnaces. In our continuous electrode baking ovens on gas, we route flue gas from the hottest zone back to heat the pre-heat zone.

4. Check outer wall and roof temperatures

Use an infrared thermometer on the furnace casing.

Surface

BEE target for heat-treatment furnaces

Ceiling / roof

110–120°C

Side walls

85–100°C

The BIS draft for reheating furnaces suggests wall and hearth skin about 50°C above ambient (maximum 100°C) and roof maximum 120°C. If your casing is much hotter, insulation has failed or is too thin.

5. Reline with ceramic fibre

BEE recommends ceramic-fibre insulation and relining for heat-treatment furnaces. Ceramic fibre stores much less heat than dense brick, so the furnace heats up faster and loses less when cycling. On our bogie-type stress-relieving furnaces, we use 250 mm of ceramic fibre and design for an outer wall no more than about 25°C above ambient.

6. Stop overheating the metal

BEE found that oil and gas furnaces often heat metal 10–30°C above what is needed. That is pure waste, and it adds scale. Fixes:

  • a calibrated thermocouple in the right position;

  • PID control with modulating burners rather than on/off;

  • multi-zone control on longer furnaces.

7. Check doors and openings

Every open door, gap or broken seal lets heat out and cold air in. Check:

  • door seals and their contact faces;

  • peep holes and charging openings;

  • how long doors stay open during loading.

The BIS draft also recommends slightly positive furnace pressure, controlled by a flue damper, to reduce air ingress and scale.

8. Load properly and avoid idle running

A half-empty furnace uses nearly as much fuel as a full one. Plan production so the furnace runs full, and avoid long idle holds at temperature. Turn down or switch off during long breaks, where the process allows.

9. Consider switching fuel

BEE estimates that switching oil to gas saves 5–10%. Gas also allows finer control. In 2026, though, gas prices and supply were volatile, so consider dual-fuel or electric options. Our guide on converting a furnace from oil to PNG explains the steps.

10. Maintain burners, elements and thermocouples

  • Clean burner nozzles and air intakes.

  • Check that flame safety and gas pressure switches work.

  • Replace drifting thermocouples and calibrate controllers.

  • On electric furnaces, use thyristor control. Kanthal recommends it to avoid rapid temperature swings that shorten element life.

A quick checklist

Check

Tool

BEE target or guide

Energy per tonne

Fuel records, production log

Track trend

Air-fuel ratio

Flue gas analyser

Gas 1.12–1.15; oil 1.15–1.20

Flue exit temperature

Thermocouple in flue

250–300°C

Roof temperature

IR thermometer

110–120°C

Side wall temperature

IR thermometer

85–100°C

Metal temperature

Load thermocouple

Not more than needed (BEE found 10–30°C overheating)

Financing the upgrade

Many of these fixes cost little. A new furnace, relining or burner system costs more. The ADEETIE scheme from BEE offers interest subvention of 5% for micro and small enterprises and 3% for medium enterprises on loans for energy-efficient technology in covered sectors, from FY2025-26 to FY2027-28. Read our ADEETIE guide.

How AHS can help

We build and refurbish hardening furnaces, tempering furnaces and bogie hearth furnaces with ceramic-fibre linings, PID and thyristor control, and gas or electric heating.

Frequently asked questions

How much energy can a heat treatment furnace save? BEE estimates that furnaces and their auxiliaries can save about 10–35% overall through better combustion, insulation, heat recovery and control.

What should the flue gas temperature be? BEE suggests a flue exit temperature of 250–300°C as a target.

How hot should the outside of my furnace be? For heat-treatment furnaces, BEE suggests about 110–120°C on the ceiling and 85–100°C on the side walls. Lower is better.

Is ceramic fibre better than brick? For batch heat-treatment furnaces that cycle, BEE recommends ceramic fibre because it stores less heat and cuts losses. Hearths and areas exposed to mechanical wear may still need brick.

Does switching from oil to gas save energy? BEE estimates 5–10% from the switch itself.

Get a furnace energy review

Send us your furnace details, working temperature, fuel use and production. We will suggest upgrades and quote for relining, burner retrofit or a new furnace.

Call +91 98105 20120 or email enquiry@ahs-in.com. Advance Heating Systems, Hastsal Industrial Area, New Delhi 110059.

Comments