top of page

Home / Oil-to-Gas Furnace Conversion

Oil-to-Gas Furnace Conversion (PNG, LPG, CNG)

Running a diesel, LDO or furnace-oil fired oven or furnace? AHS converts it on site to clean PNG, LPG or CNG firing: a new automatic burner, a double-solenoid safety gas train, pre-purge and flame-failure protection, and tuning. Most conversions take 7 to 21 days and keep the existing oven body in service. AHS does not supply new oil-fired equipment.

Retrofit scope

BURNER REPLACEMENT

Oil burner removed; automatic PNG, LPG or CNG burner sized to the chamber heat load.

DOUBLE-SOLENOID GAS TRAIN

Regulator, pressure switches, double-block solenoid valves and manual isolation sized to burner flow.

PRE-PURGE & FLAME-FAILURE LOCKOUT

Automatic sequence controller with pre-purge, ignition and UV or ionization flame proving.

CNG-TO-PNG RE-TUNING

Existing gas burners re-tuned for a change of gas, with air-gas ratio and pressure set on site.

FIRING CHAMBER REPAIR

SS-310 firing tubes, SS-304 firing chambers and insulation renewed where the old oil firing has damaged them.

CONTROLS UPGRADE

PID or PLC temperature control with burner interlocks wired into your existing panel.

How an oil-to-gas conversion works

 

Why convert now

  • Delhi NCR industries must run on approved clean fuels; see our CAQM approved fuels guide.

  • Gas firing burns cleaner, so firing tubes, flues and products stay cleaner and burner maintenance drops.

  • Automatic ignition and flame safety replace manual oil-burner lighting.

  • Clean firing suits curing, baking and annealing where soot or oil smell is a problem.

 

Fuel payback worksheet

We work out payback from your own figures before you order:

  • Current oil cost per month = litres or kg of oil used per month × your oil price.

  • Gas needed per month = heat now supplied by oil ÷ the calorific value of your gas (from your gas supplier), adjusted for burner efficiency.

  • Gas cost per month = gas needed × your gas tariff.

  • Payback (months) = conversion cost ÷ (oil cost − gas cost per month).

Read the worked cost comparison in Switching a Furnace from Diesel or Oil to PNG, or send your monthly fuel bill on WhatsApp and we will calculate it for you.

 

Typical timeline: 7 to 21 days

  • Site survey: burner position, chamber size, heat load and gas supply point checked.

  • Build at our New Delhi works: burner, gas train, controls and firing-chamber parts made and tested.

  • Installation: oil burner removed, gas burner and gas train fitted, panel interlocks wired.

  • Commissioning: gas connection by your gas supplier or contractor, then pre-purge, flame-failure and temperature tests and burner tuning.

 

Common questions

Do you supply new oil-fired ovens or furnaces?

No. AHS supplies new equipment for 415V electric, PNG, LPG, CNG and dual-fuel heating only. For existing diesel, LDO or furnace-oil equipment we offer oil-to-gas burner retrofits.

 

How long does an oil-to-gas conversion take?

Typically 7 to 21 days from order, depending on the number of burners, the gas train and when your gas connection is ready. On-site work is usually a few days.

 

Do you replace the whole furnace?

Usually not. We replace the burner and gas train, add burner safety controls and repair the firing chamber or insulation where needed, so the existing oven or furnace body stays in service.

 

Is PNG cheaper than furnace oil?

It depends on your local gas tariff and oil price. We calculate payback from your actual monthly fuel use and prices before you decide.

 

Send your requirement

Share your product, batch weight or kg/hr, working temperature and preferred clean fuel (Electric, PNG, LPG, CNG or Dual-Fuel). Use the RFQ form, WhatsApp +91 99999 79441 or call +91 98105 20120. Email: enquiry@ahs-in.com.

 

Request a quotation

Fill in the form below with your material, batch size or hourly output, working temperature and preferred fuel. An AHS engineer will reply with a sized proposal. Prefer WhatsApp? Message +91 99999 79441.

Equipment Required
Preferred Clean Fuel / Heating Source
Your Role

Converting an oil-fired furnace to gas?

Send your burner rating, fuel use and chamber size, and we will plan the retrofit.

bottom of page