The heater rating of an industrial oven is not picked from a table. It is added up from five separate heat demands, and the one input that changes the answer most is the heat-up time you allow. This guide shows the method AHS uses and works one example through.

The short answer

Heat load (kW) = heat to warm the load and its trolley + heat to warm the oven's inner structure + heat lost through the walls + heat carried out by exhaust air + heat to evaporate moisture. Add a margin of about 25% and round up to a balanced three-phase heater bank.

The five parts

  1. Load and trolley: mass (kg) x specific heat (kJ/kg.K) x temperature rise (°C) / (3,600 x heat-up hours). Use about 0.90 for aluminium, 0.49 for carbon steel and 0.55 for flux-coated welding electrodes. Count the trolley, trays and fixtures as well as the product.

  2. Inner structure: the liner sheets, baffles and ducting also have to be heated. Treat them as steel and use the same formula.

  3. Wall loss: conductivity of the insulation x wall area x temperature difference / insulation thickness, with an allowance for doors and joints.

  4. Exhaust air: fresh air drawn in to replace exhaust has to be heated from shop temperature to oven temperature.

  5. Moisture: allow about 0.7 kWh for every kg of water to be driven off.

Worked example: 2,000 kg of aluminium circles at 420°C

Take a trolley oven with a 2,100 x 1,500 x 1,350 mm chamber, 200 mm insulation, a shop temperature of 35°C and a heat-up of 6.5 hours.

  • Load and trolley: 2,520 kg x 0.90 x 385°C / (3,600 x 6.5) = about 37 kW

  • Inner structure: about 3.5 kW

  • Wall loss: about 4 kW

  • Exhaust air: about 2.5 kW

  • Moisture: none for dry circles

  • Total: about 47 kW. With a 25% margin and rounding, the installed rating is 60 kW.

That matches what AHS normally quotes for this size: 60 to 66 kW for a 2,000 kg charge, about 70 kW for 3,000 kg and about 78 kW for 4,000 kg.

Why heat-up time matters so much

Run the same 2,000 kg example with a 2.5 hour heat-up and the answer rises to about 140 kW. Nothing else has changed. A shorter cycle needs a much larger heater bank, a heavier electrical connection and a higher demand charge, so decide the cycle time before you compare two offers. Larger charges are normally given longer: roughly 6 hours for 2,000 kg and 10 hours for 4,000 kg.

From kW to a gas burner

One kW equals 860 kcal/h, so a 60 kW oven needs about 51,600 kcal/h of heat. AHS normally fits burners of 1,00,000 kcal/h. When an oven needs more than that, further burners are added and the oven is divided into zones.

Try it with your own load

The AHS oven heat load calculator does this arithmetic for batch and conveyor ovens. It gives a first estimate. The final rating is fixed in our quotation once the load, cycle and site supply are known.

To discuss your requirement, call +91 98105 20120 or send an enquiry. Every AHS oven and furnace is designed and built to order in New Delhi.

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.

About Advance Heating Systems

Advance Heating Systems has designed and built industrial ovens, furnaces, dryers and burners in New Delhi since 1991, for more than 300 clients. Every system is made to order at our works in Hastsal Industrial Area, New Delhi.

Articles on this blog are written by the Advance Heating Systems team, including Ishan Popli. For help sizing an oven or furnace for your plant, email enquiry@ahs-in.com or call +91 98105 20120.

bottom of page